Core Upstream Equipment for Salt Chemical & Bromine Industry Chain

Core Process Flow
Acidification & Oxidation
After acidity adjustment, chlorine is introduced into the raw brine to oxidize bromide ions in the liquid phase into free bromine molecules.
Air Stripping
Bromine-bearing brine enters the blowing tower, where free bromine is stripped from the liquid phase into bromine-laden air by countercurrent airflow.
Absorption & Enrichment
Bromine-laden air flows into the absorption tower and reacts with absorbents to form concentrated bromide solution, completing bromine enrichment.
Rectification & Purification
The enriched solution undergoes secondary oxidation, crude distillation and rectification to remove impurities and yield finished industrial bromine.
Core Equipment Features
Wide feedstock adaptability
Customizable process solutions for feedstocks with different bromine concentrations and water qualities, adapting to diverse resource conditions.
High extraction efficiency
Optimized tower internals and gas-liquid ratio ensure a high total bromine recovery rate and excellent resource utilization efficiency.
Superior corrosion resistance
Core wetted parts are made of special corrosion-resistant materials, adapting to highly corrosive conditions and extending service life.
Energy-saving & environmental compliance
Adopts cascade heat utilization and washing water recycling design, with low energy and water consumption and compliant waste discharge.









