EPC Services

Project Design And Research

Project Design And Research

2026-05-15

When clients need new projects,our company organizes relevant technicians who have rich experiences to analyze the local resources,then provides a brief quotation and economic benefit analysis covering the overall construction of the project plant based on the client's budget and expected daily processing capacity.

view detail
Project launch preparation

Project launch preparation

2026-05-15

Firstly, the clients should provide about 50kg representative samples, our company organizes technicians to compile experimental procedures according to the programme of communication with customers, which is handed to the technicians for taking the exploratory testing and chemical examination relying on rich experience.

view detail
Equipment Manufacture

Equipment Manufacture

2026-05-15

Adopt standardized and modular design to shorten the on-site construction period of the project.

The equipment is complete and the processing and manufacturing equipment is superior.

view detail
Equipment Procurement

Equipment Procurement

2026-05-15

With a mature and compete procurement and supplier management system, RUITU Automation Equipment Company has established long-term cooperation relations with Influential and excellent suppliers in the industry. 

view detail
Packing And Shipping

Packing And Shipping

2026-05-15

In order to ensure the equipment can arrive at the dressing plant in good condition, Ruitu Automation Equipment Company adopts 7 packaging methods such as Nude packing, Rope Bundle Packing, Wooden Packaging, Snakeskin Bag, Airform Winding Packing, Waterproof Winding Packing and Wood Pallet Packing to avoid possible damage during transportation such as collision, abrasion and corrosion etc. 

view detail
Installation And Commissioning

Installation And Commissioning

2026-05-15

Equipment installation and commissioning is a meticulous and rigorous work, strong practicality, which is directly related to whether the plant can reach the production standard. The installation of standard equipment directly effects the performance of the equipment. The installation and manufacture of non-standard equipment direct effect the stability of the whole system.

view detail
Training

Training

2026-05-15

The training of workers and the installation and commissioning are carried out simultaneously, which can save the cost of construction period for customers. 

view detail
Finished Products Produce

Finished Products Produce

2026-05-15

The equipment installation and commissioning have been completed, and the production of finished products has begun. Finished products reach the production capacity designed for the customers’ requirement, achieve the expected daily processing capacity, 

view detail